European Commission The World Bank Regional Balkans Infrastructure Study (REBIS) - Transport Final Report
 Home->Infrastructure

Regional Balkans Infrastructure Study (REBIS) - Transport Final Report

Regional Balkans Infrastructure Study (REBIS) - Transport Final Report (204 pages, pdf, 7.38 MB)

Annexes:

Appendix 1 - Final Report Network Assessment (pdf, 2.8 MB)

Appendix 2 - Final Report Border Crossings (pdf, 1.19 MB)

Appendix 3 - Final Report Traffic Projections (pdf, 369 KB)

Appendix 4 - Final Report Investment Requirements (pdf, 1.1 MB)

Appendix 5 - Final Report Methods for Project Screening and Pre-feasibility Analysis (pdf, 377 KB)

Appendix 6 - Final Report Project Screening/Project Details (pdf, 897 KB)

Appendix 7 - Final Report Pre-feasibility Studies (pdf, 561 KB)

Appendix 7.1 - Final Report Pre-feasibility Study (AL-H-06) Road Link Hani Hotit - Shkoder (pdf, 325 KB)

Appendix 7.2 - Final Report Pre-feasibility Study (BO-H-03)Reconstruction of Seslije Samac (pdf, 640 KB)

Appendix 7.3 - Final Report Pre-feasibility Study (BO-H-10) Reconstruction of South Zenica - Visoko (pdf, 562 KB)

Appendix 7.4 - Final Report Pre-feasibility Study (BO-R-02) Reconstruction of Konjic - Mostar (pdf, 1.2 MB)

Appendix 7.5 - Final Report Pre-feasibility Study (CR-H-02abc) Upgrade Semi-motorway to Full Motorway: Kikovica-Ostrovica section (CR-H-02a) Ostrovica-Vrata section (CR-H-02b) Vrata-Delnice-Kupjak section (CR-H-02c) (pdf, 446 KB)

Appendix 7.6 - Final Report Pre-feasibility Study (CR-R-02b) Modification of Electrical Traction System Mo-ravice-Rijeka-Sapjane Skrljevo-Bakar) Sections (pdf, 354 KB)

Appendix 7.7 - Final ReportPre-feasibility Study (CR-R-06an) Corridor X: Remote Control Traffic System Savski Marof - Zagreb - Tovarnik (pdf, 366 KB)

Appendix 7.8 - Final Report Pre-feasibility Study (MA-H-11) Upgrading of Gradsko-Prilep (pdf, 1.1 MB)

Appendix 7.9 - Final Report Pre-feasibility Study (MA-H-18) New motorway Kumanovo Tabanovce (pdf, 863 KB)

Appendix 7.10 - Final Report Pre-feasibility Study (MA-R-10N) Up-grading of the Railway Line Skopje Tabanovce (pdf, 265 KB)

Appendix 7.11 - Final Report Pre-feasibility Study (YU-H-11) Second Carriageway Lane Construction on E-75 Highway, Stretch: Hungarian Border (Horgo) - Novi Sad, L = 108.00 km (pdf, 13.7 MB)

Appendix 7.12 - Final Report Pre-feasibility Study (YU-H-19) Podgorica Eastern Bypass (pdf, 317 KB)

Appendix 7.13 - Final Report Pre-feasibility Study (YU-R-01ab) Rehabilitation of Belgrade Stara Pazova – Šid – Tovarnik (pdf, 365 KB)

Appendix 7.14 - Final Report Pre-feasibility Study (YU-R-02) Priority Rehabilitation of Belgrade – Niš – Presevo – Tobanovce (pdf, 339 KB)

Appendix 7.15 – Final Report Pre-feasibility Study (YU-R-07) Repair of Danube Bridges at Belgrade (pdf, 504 KB)

Appendix 7.16 - Final Report Pre-feasibility Study (YU-R-08) Reconstruction of the Zezlj Bridge at Novi Sad (pdf, 434 KB)

Appendix 7.17 – Final Report Pre-feasibility Study (YU-KO-H-04) Improvement/Up-grading of M25 Pristina-Prizren-Vrbnica (pdf, 767 KB)

Appendix 7.18 – Final Report Pre-feasibility Study (YU-KO-H-05) Western Bypass of Pristina (pdf, 546 KB)

Appendix 7.19 - Final Report Terms of Reference for Master Plan for the Port of Durres in Albania (pdf, 381 KB)

Appendix 7.20 - Final Report Pre-feasibility Study (YU-H-35N) Bypass Bijelo Polje (pdf, 2.5 MB)

Appendix 8 - Final Report Reform Process (pdf, 465 KB)

Appendix 9 - Final Report Management Information Systems (pdf, 1.17 MB)

Appendix 10 - Final Report Training (pdf, 147 KB)

Appendix 11 - Final Report Road User Charges Study (pdf, 273 KB)

Appendix 12 - Final Report BOT (pdf, 401 KB)

Appendix 13 - Final Report Railway Study (pdf, 684 KB)

Appendix 14 - Final Report Containerisation Study (pdf, 365 KB)

Appendix 15 - Final Report Sava River (pdf, 491 KB)

Appendix 16 - Final Report Concept Paper for Western Balkans Transport Observatory - SEETO (pdf, 497 KB)

Appendix 17 - Final Report Project Monitoring - Description of Database (pdf, 677 KB)

Appendix 18 - Final Report List of Persons Met (pdf, 254 KB)

Appendix 19 - Final Report List of References (pdf, 193 KB)

Appendix 20 - Final Report Meetings Held in Connection with Study (pdf, 505 KB)


Top | Home | Search | Site Map | Contact