Regional Balkans Infrastructure Study (REBIS) - Transport
Final Report
Regional Balkans Infrastructure Study
(REBIS) - Transport
Final Report (204 pages,
pdf, 7.38 MB)
Annexes:
Appendix 1 - Final Report Network Assessment
(pdf,
2.8 MB)
Appendix 2 - Final Report
Border Crossings (pdf,
1.19 MB)
Appendix 3 - Final Report Traffic Projections
(pdf,
369 KB)
Appendix 4 - Final Report Investment Requirements
(pdf,
1.1 MB)
Appendix 5 - Final Report Methods for Project Screening and Pre-feasibility Analysis
(pdf, 377 KB)
Appendix 6 - Final Report Project Screening/Project Details
(pdf,
897 KB)
Appendix 7 - Final Report Pre-feasibility Studies
(pdf,
561 KB)
Appendix 7.1 - Final Report Pre-feasibility Study (AL-H-06) Road Link Hani Hotit - Shkoder
(pdf,
325 KB)
Appendix 7.2 -
Final Report Pre-feasibility Study (BO-H-03)Reconstruction of
Seslije Samac (pdf,
640 KB)
Appendix 7.3 - Final Report
Pre-feasibility Study (BO-H-10) Reconstruction of South Zenica - Visoko
(pdf,
562 KB)
Appendix 7.4 - Final Report
Pre-feasibility Study (BO-R-02) Reconstruction of Konjic - Mostar
(pdf,
1.2 MB)
Appendix 7.5 - Final Report
Pre-feasibility Study (CR-H-02abc) Upgrade Semi-motorway to Full Motorway: Kikovica-Ostrovica section (CR-H-02a) Ostrovica-Vrata section (CR-H-02b) Vrata-Delnice-Kupjak section (CR-H-02c)
(pdf,
446 KB)
Appendix 7.6 - Final Report Pre-feasibility Study (CR-R-02b) Modification of Electrical Traction System
Mo-ravice-Rijeka-Sapjane Skrljevo-Bakar) Sections (pdf,
354 KB)
Appendix 7.7 - Final
ReportPre-feasibility Study (CR-R-06an) Corridor X: Remote Control Traffic System Savski Marof - Zagreb - Tovarnik
(pdf,
366 KB)
Appendix 7.8 - Final Report
Pre-feasibility Study (MA-H-11) Upgrading of Gradsko-Prilep (pdf,
1.1 MB)
Appendix 7.9 - Final Report Pre-feasibility Study (MA-H-18) New motorway Kumanovo Tabanovce
(pdf,
863 KB)
Appendix 7.10 - Final Report
Pre-feasibility Study (MA-R-10N) Up-grading of the Railway Line Skopje Tabanovce
(pdf,
265 KB)
Appendix 7.11 - Final Report
Pre-feasibility Study (YU-H-11) Second Carriageway Lane Construction on E-75 Highway, Stretch: Hungarian Border
(Horgo) - Novi Sad, L = 108.00 km
(pdf,
13.7 MB)
Appendix 7.12 - Final Report
Pre-feasibility Study (YU-H-19) Podgorica Eastern Bypass (pdf,
317 KB)
Appendix 7.13 - Final Report
Pre-feasibility Study (YU-R-01ab) Rehabilitation of Belgrade Stara Pazova – Šid – Tovarnik
(pdf,
365 KB)
Appendix 7.14 - Final Report
Pre-feasibility Study (YU-R-02) Priority Rehabilitation of Belgrade – Niš – Presevo – Tobanovce
(pdf,
339 KB)
Appendix 7.15 – Final Report
Pre-feasibility Study (YU-R-07) Repair of Danube Bridges at Belgrade
(pdf,
504 KB)
Appendix 7.16 - Final Report
Pre-feasibility Study (YU-R-08) Reconstruction of the Zezlj Bridge at Novi Sad
(pdf,
434 KB)
Appendix 7.17 – Final Report
Pre-feasibility Study (YU-KO-H-04) Improvement/Up-grading of M25 Pristina-Prizren-Vrbnica
(pdf,
767 KB)
Appendix 7.18 – Final Report
Pre-feasibility Study (YU-KO-H-05) Western Bypass of Pristina (pdf,
546 KB)
Appendix 7.19 - Final Report Terms of Reference for Master Plan for the Port of Durres in Albania
(pdf,
381 KB)
Appendix 7.20 - Final Report
Pre-feasibility Study (YU-H-35N) Bypass Bijelo Polje (pdf,
2.5 MB)
Appendix 8 - Final Report
Reform Process (pdf,
465 KB)
Appendix 9 - Final Report
Management Information Systems (pdf,
1.17 MB)
Appendix 10 - Final Report
Training (pdf,
147 KB)
Appendix 11 - Final Report Road User Charges Study
(pdf,
273 KB)
Appendix 12 - Final Report BOT
(pdf,
401 KB)
Appendix 13 - Final Report
Railway Study (pdf,
684 KB)
Appendix 14 - Final Report
Containerisation Study (pdf,
365 KB)
Appendix 15 - Final Report Sava River
(pdf,
491 KB)
Appendix 16 - Final Report
Concept Paper for Western Balkans Transport Observatory - SEETO (pdf,
497 KB)
Appendix 17 - Final Report
Project Monitoring - Description of Database (pdf,
677 KB)
Appendix 18 - Final Report List of Persons Met
(pdf,
254 KB)
Appendix 19 -
Final Report List of References (pdf,
193 KB)
Appendix 20 -
Final Report Meetings Held in Connection with Study (pdf,
505 KB)
|