Sector, Country
and
Project
Number |
Project
Name
|
Project
Description
|
Total
Cost
M
EUR |
Preparating
Status and Comments
|
Committed/Intended
Source of
Financing
M
EUR |
Funding
Gap
M
EUR |
|
Quick-
Start
Projects |
Near-
Term
Projects |
Quick-
Start
Projects |
Near-
Term
Projects |
|
ROADS
|
|
Albania
|
|
1101 |
Lushnje-Fier |
North-South,
Corridor VIII, 2-lane road reconstruction, 32 km |
15 |
|
Study
available |
Italy |
15 |
|
|
1102 |
Fier-Vlore |
North-South,
Corridor VIII, 2-lane road reconstruction, 35 km |
21 |
|
Study
available |
EIB |
21 |
|
|
1103 |
Pogradec-Korce |
East-West,
Corridor VIII, 2-lane road reconstruction, 40 km |
19 |
|
Detailed
design available; start poss. in 2000 |
EIB |
19 |
|
|
1104 |
Elbasan-Librazdh |
East-West,
Corridor VIII, 2-lane road reconstruction, 31 km |
14 |
|
Tender
in 2000;EBRD loan signed |
EBRD(10) /
Italy(2.3) / CEI(1.7) |
|
|
|
1105 |
Durres-Kukes
(access to Kosovo) |
Emergency
repairs and pavement strengthening on 221 km |
15 |
|
WB
loan signed |
WB(14) /
Gov(0.8) |
|
|
|
Bosnia
and Herzegovina
|
|
2101 |
Roads
- sections of corridor Vc |
North-South
Corridor, semi-motorway,10 km; Capljina Bridge |
57 |
|
Some
studies available |
Concess.EIB-EC(28) |
29 |
|
|
Bulgaria
|
|
3101 |
Danube
bridge Vidin-Calafat |
Comb.road/rail
bridge connect. western Bulgaria and Romania |
5 |
185 |
Bilat.
agreem. finalised; det. study required |
EIB |
5 |
185 |
|
Croatia
|
|
4101 |
Roads
- sections of Corridor Vb |
N-S
Corridor, motorway Breznicki Hum-Varazdin 23 km |
100 |
50 |
Study
available; Staged construction |
EIB |
30 |
50 |
|
FYR of
Macedonia
|
|
5101 |
Blace
border post |
Urgent
infrastructure and building works |
7 |
|
Subject
to UNMIK/FYROM agreement |
EC |
7 |
|
|
5102 |
Skopje
bypass |
East-West
corridor, new 4-lane road construction, 23 km |
39 |
50 |
EIB
loan; EC(10) Tetovo south start 2000 |
concess.
EIB-EC(45) / Gov.(4) |
25 |
15 |
|
5103 |
Demir
Kapija-Gevgelija (Greek border) |
North-South
corridor, new 2-lane road construction, 30 km |
32 |
|
Det.eng.ongoing;EC(8)Neg.-Demi
K.start 2000 |
concess.EIB-EC(15)
/ Gov.(2) |
15 |
|
|
Romania
|
|
6101 |
Bucharest
- Cernavoda |
East-West,sections
of Corridor IV, completion motorway, 151 km |
270 |
70 |
Existing
EIB loan |
EIB(210) / EC |
60 |
70 |
|
6102 |
Bucharest-Giurgiu |
North-South,
section of corridor IX, rehab. and widening, 48 km |
62 |
|
|
EC(41) / EIB |
21 |
|
|
Kosovo, FRY
|
|
7101 |
Emertgency
road rehabilitation |
Rehabilitation
of international routes |
43 |
|
|
WB(5) |
38 |
|
|
Montenegro, FRY
|
|
7103 |
Transport
rehabilitation 1 |
Urgent
rehabilitation (road, railway and/or port) |
15 |
|
Composition
still to be defined |
|
15 |
|
|
Regional
|
|
8101 |
Transport
Infrastructure Regional Study |
Determination
of investment priorities in the land transport sector |
5 |
|
First
indicative TINA-based assessment |
EC |
5 |
|
|
8102 |
Trade
& Transport Facilit. Program |
Regional
programme in 6 countries covering border crossings |
86 |
|
|
WB
and other donors |
|
|
|
RAILWAYS |
|
Bosnia
and Herzegovina
|
|
2201 |
Bridge
reconstruction |
Samac
(rail) and Jasenovac (road) bridges |
17 |
|
|
EC(17) |
|
|
|
Croatia
|
|
4201 |
Railways
- sections of Corridor Vc |
N-S
Corridor, electr.and resignalling, Beli Manastir-Vrpolje-Ploce |
22 |
|
|
|
22 |
|
|
PORTS
AND WATERWAYS |
|
Bulgaria
|
|
3311 |
Danube
river ports rehabilitation |
Urgent
port rehabilitation along river Danube in Bulgaria |
5 |
15 |
Study
required |
|
5 |
15 |
|
Other
(1)
|
|
7311 |
Danube
obstacle removal |
|
25 |
|
|
EC(22) /
bilateral(3) |
|
|
|
(1)
Figures included in this table concerning obstacle removal and
the reconstruction of certain bridges have been provided by
the Danube Commission. No EIB assessment took place.
Implementation of such projects can only take place once
political conditions have been met. |
|
AIRPORTS |
|
Bulgaria
|
|
3401 |
Sofia
airport development |
New
passenger terminal and rehabilitation of runway |
150 |
|
Tendering
launched |
EIB(60) /
Koweit(40)/EC |
50 |
|
|
Regional
|
|
8401 |
Air
Traffic Infrastructure Regional Study |
Determination
of investment priorities in the air transport sector |
5 |
|
|
NORAD |
5 |
|
|
ELECTRICITY |
|
Albania
|
|
1501 |
Power
sector investment study |
Priorities
in generation and transmission investments |
1 |
|
EC and CIDA interested in principle |
|
1 |
|
|
Bosnia
and Herzegovina
|
|
2501 |
Power
system detailed study |
Study
of conditions for re-establishment of linkage to UCTE |
0.5 |
|
|
|
0.5 |
|
|
2502 |
3rd
Electric Power (transmission) |
Transmission
lines, substations (incl. Mostar) and SCADA |
25 |
102 |
Feasibility
studies available |
WB(30) /
EBRD(20) |
5 |
72 |
|
Croatia
|
|
4501 |
Power
system study |
Study
of conditions for re-establishment of linkage to UCTE |
0.5 |
|
CIDA
interested in principle
|
|
0.5 |
|
|
FYR of
Macedonia
|
|
5501 |
Power
sector investment study |
Priorities
in generation and transmission investments |
1 |
|
|
|
1 |
|
|
Regional
|
|
8501 |
Balkan
Electricity Co-operation Study |
Including
institutional aspects |
8 |
|
PHARE
and BEITF studies available |
|
8 |
|
|
GAS,
OIL AND DISTRICT HEATING |
|
Regional
|
|
8601 |
Natural
gas network study |
including
a strategic assessment of existing feasibility studies |
1.5 |
|
|
|
1.5 |
|
|
8611 |
Oil
pipeline network study |
including
a strategic assessment of existing feasibility studies |
1.5 |
|
|
|
1.5 |
|
|
WATER |
|
Albania
|
|
1701 |
Water
supply and wastewater rehab. |
Vlore,
Fier, Lezhe, Saranda and Gjirokaster |
27 |
|
|
EC
(27) |
|
|
|
Croatia
|
|
4701 |
Rijeka
water sewerage |
|
10 |
|
|
EBRD(8) /
Loc.(2) |
|
|
|
4702 |
Environmental
master plan |
Adriatic |
1 |
|
|
|
1 |
|
|
FYR of
Macedonia
|
|
5701 |
Municipal
Environmental Action Program |
Improvement
of water and wastewater infrastructure |
25 |
25 |
|
EBRD(20) /
Loc.(5) |
|
25 |