European Commission The World Bank HomeEconomic Reconstruction and Development in South East Europe Bosnia and Herzegovina
Bosnia and Herzegovina->European Commission Support

 The EC reconstruction programme for Bosnia and Herzegovina detailed by sector


The European Community (EC) Energy Programme

Brief description
   

Year of commitment and Budget Line

Project Description and Contractor/Partner in brackets:

Contracted/ Allocated

Contract status (on 01/11/00):

Amount Allocated in EURO
(Approximate)

1996 PHARE

EAP: Supplies (Italrend):

     

Completed

19,300,000.00

     

Tuzla power station, Kakanj power station, Elektroprivreda, Sarajevogas, and several coal mines in BiH.

1996 PHARE

EAP: Rehabilitation of power electrical systems in BiH:

     

7,000,000.00

    

Technical Assistance and project preparation (BCEOM).

299,996.00

Completed

     

    

Technical Assistance and project preparation (BCEOM)

283,695.00

Completed

     

    

Technical Assistance and project preparation (BCEOM)

282,867.00

Completed

     

    

Rehabilitation of electricity network (EnergoControl)

805,492.00

Completed

     

    

Rehabilitation of electricity network (EnergoControl)

328,602.00

Completed

     

   

Equipment supply - power transformers and stations, transformer oil for EP Republika Srpska (Diveco d.o.o.)

207,050.00

Completed

     

   

Equipment supply - power transformers and stations, transformer oil for EP Mostar (Diveco d.o.o.)

1,488,218.00

Completed

    

   

Equipment supply - electric cubicles and cabinets, disconnectors etc. for EP Sarajevo (Schneider Electric SA)

1,180,775.00

Completed

    

   

Equipment supply - concrete poles and structures, insulators and accessories for EP Sarajevo (Malcom)

1,537,027.00

Completed

    

   

Equipment supply - electric cubicles and cabinets, disconnectors etc. for EP Republika Srpska (Energoinvest d.d. Sarajevo).

494,851.00

Completed

    

   

Rehabilitation of electicity network Lot 6 (Energoinvest)

50,938.13

Completed

   

1996 PHARE

EAP: Rehabilitation Doboj Central Heating system:

   

   

1,000,000.00

   

Project preparation: (Carlson Wagonlit Travel)

1,521.00

Completed

   

   

Rehabilitation of Doboj District Heating (Energoinvest d.d. Sarajevo)

958,282.00

Completed

   

1996 Obnova

Rehabilitation Distribution Network in BiH:

   

   

13,500,000.00

   

Equipment and materials supply (Koncar)

6,091,734.60

Completed

   

   

Equipment and materials supply (Koncar)

18,403.30

Completed

   

   

Equipment and materials supply (Koncar)

1,694,420.00

Completed

   

   

Equipment and materials supply (ABB)

767,400.54

Completed

    

   

Equipment and materials supply (Elektra Sistem)

865,609.06

Completed/default due to force majure

    

Equipment and materials supply (MDP Energoinzinjering ZDP)

3,417,141.44

Completed

    

    

Equipment and materials supply (Koncar & Electric Traction Engineering Inc.)

224,910.00

Completed

    

    

Equipment and materials supply (Schneider Electric SA)

239,550.00

Completed

    

    

Support for rehabilitation of electricity network (ESB Int.)

21,911.00

Completed

    

    

Assesment of the technical doc for the procurement of supplies for electricity network in B&H (Devco)

49,964.00

Completed

    

    

Preparation of Terms of Reference (ToR) (Devco)

5,640.00

Completed

    

    

Rehabilitation of electricity network in BiH (Chandelier)

19,161.00

Completed

    

1996

Total allocated funds in 1996

 

Sub-Total:

40,800,000.00

1997 Obnova

Energy Programme

    

    

10,500,000.00

   

Electricity Distribution System Repair - Banja Luka. Supply of equipment to be provided to Elektrokrajina.

750,000.00

In preparation

   

   

Electricity Distribution System Repair - Elektro- Bijeljina

500,000.00

   

   

   

Electricity Distribution System Repair - Doboj, Stanari, Vukoslavje, Derventa, Modrica, Brod, Teslic, Samac. Supply of equipment to Elektrodistribucija Doboj.

700,000.00

In preparation

   

   

Electricity Distribution System Repair - Odzak area.

2,000,000.00

In preparation

   

   

Reconstruction of medium and low voltage networks damaged during war period, including supply of equipment for Elektroprivreda and Elektrodistribucija

   

Electricity Distribution System Repair - Orasje district.

500,000.00

In preparation

   

   

Reconstruction of medium and low voltage networks damaged during war period, including supply of equipment for Elektroprivreda and Elektrodistribucija

   

Electricity Distribution System Repair - Brcko-Ravne district.

300,000.00

In preparation

   

   

Reconstruction of medium and low voltage networks damaged during war period, including supply of equipment for Elektroprivreda and Elektrodistribucija

   

Electricity Distribution System Repair - Kiseljak district.

300,000.00

In preparation

   

   

Reconstruction of medium and low voltage networks damaged during war period, including supply of equipment for Elektroprivreda and Elektrodistribucija

   

Electricity Distribution System Repair - Glamoc district.

500,000.00

In preparation

   

   

Reconstruction of medium and low voltage networks damaged during war period, including supply of equipment for Elektroprivreda and Elektrodistribucija

   

Electricity Distribution System Repair - Kupres district.

700,000.00

In preparation

   

   

Reconstruction of medium and low voltage networks damaged during war period, including supply of equipment for Elektroprivreda and Elektrodistribucija

   

Rehabilitation of transmission lines and substations in Prijedor-Banja Luka area and Gorazde.

2,000,000.00

In preparation

   

   

Hydro Turbines - Oil treatment facilities to the Electricity Generation Division of Elektroprivreda Republika Srpska.

400,000.00

In preparation

   

   

Security and maintenance and tools for transmission and distribution for Elektroprivreda Republika Srpska.

300,000.00

In preparation

   

   

Security and maintenance and tools for transmission and distribution for Elektroprivreda Mostar

300,000.00

In preparation

   

   

Supervision and Monitoring (SAFEGE).

730,000.00

Ongoing

   

   

Contingencies (SAFEGE)

520,000.00

Ongoing

   

1997 Obnova

Energy programme II

   

   

10,000,000.00

   

Reconstruction of energy networks in and around Sarajevo: Electricity Unsko Sanski. Reconstruction of medium and low voltage networks damaged during war period, including supply of equipment for Elektroprivreda and Elektrodistribucija.

1,100,000.00

In preparation

   

   

Reconstruction of energy networks in and around Sarajevo: Electricity Tesanj & Maglaj. Supply of equipment for Elektrodistribucija Doboj.

900,000

In preparation

   

   

Reconstruction of energy networks in and around Sarajevo: Electricity Sarajevo. Supply of equipment for Elektrodistribucija Sarajevo.

1,000,000.00

In preparation

   

   

Reconstruction of energy networks in and around Sarajevo: SEUROrity, maintenance, and tools for transmission and distribution for Elektroprivreda Bosnia and Herzegovina.

700,000.00

In preparation

   

    

Reconstruction of energy networks in and around Sarajevo: Electricity Tuzlansko-Podinjski.

900,000.00

In preparation

   

   

Reconstruction of energy networks in and around Sarajevo: Heating Sarajevo. Supply of equipment to Toplane Sarajevo: (Brugman BH)

1,670,095.10

Completed

   

   

Reconstruction of energy networks in and around Sarajevo: Gas rehabilitation in Sarajevo.

   

- Provision of meter/regulator units for Sarajevogas: (Unis Fagas)

2,104,174.35

Completed

   

   

- Provision of meter/regulators: (Unis Fagas)

144,900.00

Completed

   

   

- Tariff structure study for Sarajevogas: (Cowi)

99,985.00

Completed

   

   

Reconstruction of Energy: Technical Assistance Unit (TAU)

   

   

   

Supervision: (CIT)

1,122.00

Completed

   

   

Reconstruction of Energy: Contingencies.

   

   

   

   

- Rehabilitation of District heating Sarajevo (Brugman)

109,642.00

Completed

   

   

- Preparation of Standard Electrical Specifications for BiH(ESBI)

39,000.00

Completed

   

   

- Preparation of Standard Electrical Specifications for BiH (ESBI)

108,550.00

Completed

   

   

- Study for Toplane Sarajevo

100,000.00

In preparation

   

   

Management & supervision (SAFAGE)

723,174.00

Completed

   

   

Technical Assistance (Kevin Mannion)

5,704.00

Completed

   

1997

Total allocated funds in 1997

   

Sub-Total:

20,500,000.00

    

Total allocated funds in 1996 & 1997:

61,300,000.00


The EC reconstruction programme for Bosnia and Herzegovina detailed by sector:
Energy | Water and Waste | Mine Clearance | Transport | Telecommunications | Europe for Sarajevo | Micro Projects | Reconstruction and Return | Social Cohesion and Development | Dayton Institutions | Media and Culture | Economic Regeneration | Institutional Strengthening | Natural Resources | Customs
The World Bank European Commission Top Home Search Site Map Contact